Industrial Wireless Point-to-Point Bridge – AHF to Weighbridge.
Survey and implementation work for industrial point-to-point connectivity, covering installation planning, field integration, and documentation.
- Company
- PT Indo Raya Tenaga
- Period
- 2026
- Status
- Survey / Implementation
01 / Scope & contribution
- Conducted a site survey and designed wireless point-to-point connectivity.
- Planned outdoor bridge installation and custom mounting brackets/poles.
- Integrated PoE switching and field equipment.
- Configured VLAN and static network settings.
- Planned cable and conduit routing.
- Included permit, fallback-connectivity, EDR, and field-testing considerations.
- Prepared site-survey and installation documentation.