Industrial Wireless Point-to-Point Bridge – AHF to Weighbridge.

Survey and implementation work for industrial point-to-point connectivity, covering installation planning, field integration, and documentation.

Company
PT Indo Raya Tenaga
Period
2026
Status
Survey / Implementation

01 / Scope & contribution

  • Conducted a site survey and designed wireless point-to-point connectivity.
  • Planned outdoor bridge installation and custom mounting brackets/poles.
  • Integrated PoE switching and field equipment.
  • Configured VLAN and static network settings.
  • Planned cable and conduit routing.
  • Included permit, fallback-connectivity, EDR, and field-testing considerations.
  • Prepared site-survey and installation documentation.