PROJECT / 22Major Case Study
Network & Wireless Infrastructure at BP Petrochemicals Indonesia – Batch 2.
Designed and installed factory network and wireless infrastructure, integrating the Indonesian environment into the BP global network.
- Company
- PT Nusantara Compnet Integrator
- Period
- Aug 2015 – Jan 2016
- Status
- Completed
01 / Scope & contribution
- Designed and installed infrastructure for a newly acquired factory in Indonesia.
- Integrated the Indonesian environment into the BP global network.
- Implemented redundant Cisco switching and WAN connectivity using HSRP, BGP, and DMVPN.
- Performed wireless assessment and tuning using Fluke AirMagnet.
- Deployed Cisco controller-based wireless.