PROJECT / 22Major Case Study

Network & Wireless Infrastructure at BP Petrochemicals Indonesia – Batch 2.

Designed and installed factory network and wireless infrastructure, integrating the Indonesian environment into the BP global network.

Company
PT Nusantara Compnet Integrator
Period
Aug 2015 – Jan 2016
Status
Completed

01 / Scope & contribution

  • Designed and installed infrastructure for a newly acquired factory in Indonesia.
  • Integrated the Indonesian environment into the BP global network.
  • Implemented redundant Cisco switching and WAN connectivity using HSRP, BGP, and DMVPN.
  • Performed wireless assessment and tuning using Fluke AirMagnet.
  • Deployed Cisco controller-based wireless.